{"id":5167,"date":"2026-06-19T05:52:17","date_gmt":"2026-06-19T05:52:17","guid":{"rendered":"https:\/\/teknoprogettisrl.it\/seismic-vulnerability-of-an-industrial-warehouse-how-to-gain-two-risk-classes-with-mechanical-connections\/"},"modified":"2026-06-26T09:04:28","modified_gmt":"2026-06-26T09:04:28","slug":"seismic-vulnerability-of-an-industrial-warehouse-how-to-gain-two-risk-classes-with-mechanical-connections","status":"publish","type":"post","link":"https:\/\/teknoprogettisrl.it\/en\/seismic-vulnerability-of-an-industrial-warehouse-how-to-gain-two-risk-classes-with-mechanical-connections\/","title":{"rendered":"Seismic vulnerability of an industrial warehouse: how to gain two risk classes with mechanical connections"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"5167\" class=\"elementor elementor-5167 elementor-5010\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-ca62d9f elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"ca62d9f\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4a58e16\" data-id=\"4a58e16\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-88bf199 elementor-widget elementor-widget-text-editor\" data-id=\"88bf199\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>In precast industrial buildings constructed before 2008, seismic vulnerability lies not in the strength of the materials, but in the absence of mechanical connections between beams, columns and roof tiles \u2014 the collapse mechanism that emerged dramatically in the 2012 Emilia earthquake. Teknoprogetti Engineering assessed the seismic vulnerability of a production complex in Brugherio (MB) for Seriana Edilizia, taking Building B from Risk Class C to Risk Class A on the IS-V scale (iPGA from 0.53 to 0.96) by installing certified mechanical connections at the critical joints. <\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-7459e8f elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7459e8f\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-322011e\" data-id=\"322011e\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-10e765a elementor-widget elementor-widget-image\" data-id=\"10e765a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"489\" src=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/01-vulnerabilita-sismica-capannone-industriale-brugherio-intervento-sismico-1024x626.jpg\" class=\"attachment-large size-large wp-image-4995\" alt=\"\" srcset=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/01-vulnerabilita-sismica-capannone-industriale-brugherio-intervento-sismico-1024x626.jpg 1024w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/01-vulnerabilita-sismica-capannone-industriale-brugherio-intervento-sismico-300x184.jpg 300w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/01-vulnerabilita-sismica-capannone-industriale-brugherio-intervento-sismico-768x470.jpg 768w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/01-vulnerabilita-sismica-capannone-industriale-brugherio-intervento-sismico.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3d44721 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"3d44721\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9c95981\" data-id=\"9c95981\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-b8cea72 elementor-widget elementor-widget-text-editor\" data-id=\"b8cea72\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>Exterior view of the industrial building in Brugherio (MB): one of the five precast buildings covered by the seismic vulnerability assessment<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-f51f671 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"f51f671\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-a4a5519\" data-id=\"a4a5519\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-40d7ada elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"40d7ada\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-18c84df elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"18c84df\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-b500451\" data-id=\"b500451\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6a5f9dd elementor-widget elementor-widget-text-editor\" data-id=\"6a5f9dd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>When it comes to the seismic safety of industrial buildings, the issue of structural connections in precast buildings is one of the most underestimated \u2014 and one of the most dangerous, as the 2012 Emilia earthquake dramatically taught us. The case presented here, developed for Seriana Edilizia on a production complex in Brugherio, is a concrete example of what it means to carry out a <a href=\"https:\/\/teknoprogettisrl.it\/en\/analysis\/\" target=\"_blank\" rel=\"noopener\">serious assessment of structures<\/a> built before 2008, the year in which seismic design became mandatory in Lombardy. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-f222015 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"f222015\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-76a7198\" data-id=\"76a7198\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-ee3e547 elementor-widget elementor-widget-heading\" data-id=\"ee3e547\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The production complex: five buildings, the same construction logic<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-3325304 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"3325304\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9f2ea32\" data-id=\"9f2ea32\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-cf330c4 elementor-widget elementor-widget-image\" data-id=\"cf330c4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"461\" src=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/02-cantiere-seriana-edilizia-rinforzo-sismico-capannone-industriale-1024x590.jpg\" class=\"attachment-large size-large wp-image-4997\" alt=\"\" srcset=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/02-cantiere-seriana-edilizia-rinforzo-sismico-capannone-industriale-1024x590.jpg 1024w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/02-cantiere-seriana-edilizia-rinforzo-sismico-capannone-industriale-300x173.jpg 300w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/02-cantiere-seriana-edilizia-rinforzo-sismico-capannone-industriale-768x442.jpg 768w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/02-cantiere-seriana-edilizia-rinforzo-sismico-capannone-industriale.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-fa19149 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"fa19149\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-aa7095d\" data-id=\"aa7095d\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6b58a38 elementor-widget elementor-widget-text-editor\" data-id=\"6b58a38\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>The industrial complex in Brugherio: five single-storey buildings with cast-in-situ and precast reinforced-concrete structures<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-8ac0e97 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"8ac0e97\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-780e972\" data-id=\"780e972\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6454f37 elementor-widget elementor-widget-text-editor\" data-id=\"6454f37\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The complex under investigation consists of five buildings, all single-storey, with reinforced-concrete structures both cast in situ and precast. We focus here on Building B, which is overall the most instructive case for understanding where the real vulnerability of these structures lies and how it is possible to intervene in a targeted way. <\/p><p>The five buildings share the same construction logic: columns in cast reinforced concrete or precast prestressed reinforced concrete, double-pitch or box girders, and precast double-T roof tiles. The roofing is uniform across the whole complex \u2014 a waterproof membrane is laid over the tiles, then a corrugated metal sheet onto which the photovoltaic panels are anchored. No original structural drawings were found, but the absence of cracking or deformation patterns attributable to the foundations made it possible to rule out investigations at that level, as provided for by the 2018 Ministerial Decree. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-6458fdf elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"6458fdf\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-3ed8ac6\" data-id=\"3ed8ac6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-a8f2742 elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"a8f2742\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-776b1a2 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"776b1a2\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-b89b08e\" data-id=\"b89b08e\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-1ea3f9a elementor-widget elementor-widget-heading\" data-id=\"1ea3f9a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The investigation campaign: methods and material characterisation<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-dccf7ad elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"dccf7ad\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-810efc5\" data-id=\"810efc5\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-1ab2185 elementor-widget elementor-widget-image\" data-id=\"1ab2185\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"440\" src=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/357-tegoli-prefabbricati-1024x563.jpg\" class=\"attachment-large size-large wp-image-5054\" alt=\"\" srcset=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/357-tegoli-prefabbricati-1024x563.jpg 1024w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/357-tegoli-prefabbricati-300x165.jpg 300w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/357-tegoli-prefabbricati-768x422.jpg 768w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/357-tegoli-prefabbricati.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-e6af5af elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"e6af5af\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-d5c8a87\" data-id=\"d5c8a87\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6420f86 elementor-widget elementor-widget-text-editor\" data-id=\"6420f86\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>Interior view of the roof: the precast double-T roof tiles rest on the beams without mechanical connections \u2014 the main factor of seismic vulnerability<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-65a953b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"65a953b\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1653964\" data-id=\"1653964\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-abe92f8 elementor-widget elementor-widget-text-editor\" data-id=\"abe92f8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The investigation campaign, carried out through repeated site visits between September and October 2021, included <a href=\"https:\/\/teknoprogettisrl.it\/servizi\/settore-controlli-non-distruttivi\/\" target=\"_blank\" rel=\"noopener\">sample non-destructive testing<\/a> on the columns and beams of all five buildings: combined rebound-hammer and ultrasonic tests to estimate the strength of the concrete, processed using the Gasparirik and Di Leo-Pascale methods.<\/p><p>The results show concrete generally in good condition, with average strengths varying significantly from one building to another. In Building B, the columns show average values between <strong>61 and 88 N\/mm\u00b2<\/strong>, while the roof beams range between <strong>52 and 76 N\/mm\u00b2<\/strong>, with FeB44k steel common to all the structures. The level of knowledge achieved is LC2, with a confidence factor FC = 1.20 applied to all elements.  <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-86a355e elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"86a355e\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1c72ce8\" data-id=\"1c72ce8\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-1e0999c elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"1e0999c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-d91a6b9 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"d91a6b9\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9e42e80\" data-id=\"9e42e80\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-87d6160 elementor-widget elementor-widget-heading\" data-id=\"87d6160\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Vulnerability in the as-is condition: why the structure does not withstand an earthquake<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-be5fc1b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"be5fc1b\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-345a385\" data-id=\"345a385\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-07df109 elementor-widget elementor-widget-image\" data-id=\"07df109\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"440\" src=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/360-nodo-trave-pilastro-1024x563.jpg\" class=\"attachment-large size-large wp-image-5056\" alt=\"\" srcset=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/360-nodo-trave-pilastro-1024x563.jpg 1024w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/360-nodo-trave-pilastro-300x165.jpg 300w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/360-nodo-trave-pilastro-768x422.jpg 768w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/360-nodo-trave-pilastro.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-11c7b6c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"11c7b6c\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-7770d85\" data-id=\"7770d85\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-cc59043 elementor-widget elementor-widget-text-editor\" data-id=\"cc59043\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>Beam-column joint in the as-is condition: the absence of mechanical connections exposes the structure to the risk of the roof tiles losing their support in the event of an earthquake<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-eaa76a6 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"eaa76a6\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-3eea59c\" data-id=\"3eea59c\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-3a7eaec elementor-widget elementor-widget-text-editor\" data-id=\"3a7eaec\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Building B, in its as-is condition, is unable to withstand the seismic actions required by Ministerial Decree 17.01.2018. The main critical issue is not in the columns or the beams \u2014 which show fairly good mechanical properties of the concrete \u2014 but in the behaviour of the assembly as a whole. The structure is essentially without mechanical connections at the beam-column and beam-tile joints, and the supports of the tiles on the beams are of limited size.  <\/p><p>In the event of an earthquake, the horizontal displacements at the top of the columns reach values of around 7.6 cm: enough to cause the roof tiles to lose their support (the maximum displacement allowed by the geometry of the support is \u2264 4 cm) and the consequent collapse of the roof. This is a collapse mechanism that does not depend on the strength of the materials, but on the lack of restraints to prevent the precast elements from sliding out of place. <\/p><p>The minimum seismic risk indicator in the as-is condition is iPGA (\u03b6E) = 0.53, with a seismic classification of Class C in terms of IS-V. The collapse mechanism is the fall of the tiles from the beams. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-f946863 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"f946863\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-564b30e\" data-id=\"564b30e\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6364ad3 elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"6364ad3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-dc10b6d elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"dc10b6d\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-a158916\" data-id=\"a158916\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6da8bb9 elementor-widget elementor-widget-heading\" data-id=\"6da8bb9\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The proposed intervention: mechanical connections at the critical joints<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-97a9f1d elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"97a9f1d\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-79e8c20\" data-id=\"79e8c20\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-9af51f2 elementor-widget elementor-widget-image\" data-id=\"9af51f2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"440\" src=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/05-connessioni-pannelli-parete-miglioramento-sismico-capannone-1024x563.jpg\" class=\"attachment-large size-large wp-image-5003\" alt=\"\" srcset=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/05-connessioni-pannelli-parete-miglioramento-sismico-capannone-1024x563.jpg 1024w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/05-connessioni-pannelli-parete-miglioramento-sismico-capannone-300x165.jpg 300w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/05-connessioni-pannelli-parete-miglioramento-sismico-capannone-768x422.jpg 768w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/05-connessioni-pannelli-parete-miglioramento-sismico-capannone.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b147347 elementor-widget elementor-widget-text-editor\" data-id=\"b147347\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>Connections between precast infill panels and columns: a complementary intervention to prevent the roof tiles from losing their support on the beams.<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-85bc60d elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"85bc60d\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-top-column elementor-element elementor-element-009fbf1\" data-id=\"009fbf1\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-128cb05 elementor-widget elementor-widget-image\" data-id=\"128cb05\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-1-connessioni-meccaniche-768x1024.jpg\" class=\"attachment-large size-large wp-image-5073\" alt=\"\" srcset=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-1-connessioni-meccaniche-768x1024.jpg 768w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-1-connessioni-meccaniche-225x300.jpg 225w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-1-connessioni-meccaniche-1152x1536.jpg 1152w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-1-connessioni-meccaniche.jpg 1200w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-top-column elementor-element elementor-element-9214a5d\" data-id=\"9214a5d\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-24eb977 elementor-widget elementor-widget-image\" data-id=\"24eb977\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-2-connessioni-meccaniche-768x1024.jpg\" class=\"attachment-large size-large wp-image-5075\" alt=\"\" srcset=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-2-connessioni-meccaniche-768x1024.jpg 768w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-2-connessioni-meccaniche-225x300.jpg 225w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-2-connessioni-meccaniche-1152x1536.jpg 1152w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/06\/6-2-connessioni-meccaniche.jpg 1200w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-5052875 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"5052875\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-0fa8029\" data-id=\"0fa8029\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-f67387f elementor-widget elementor-widget-text-editor\" data-id=\"f67387f\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>The mechanical connections prevent the infill panels from overturning out of their plane.<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-48b0e9b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"48b0e9b\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-8e3b583\" data-id=\"8e3b583\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-0752e25 elementor-widget elementor-widget-text-editor\" data-id=\"0752e25\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The solution does not require invasive work on the load-bearing structures. The principle is to kinematically restrain the precast elements: <a href=\"https:\/\/teknoprogettisrl.it\/en\/services\/structural-specialty-design\/\" target=\"_blank\" rel=\"noopener\">mechanical connections<\/a> between beam and column and between beam and tile, made with certified systems designed to prevent the roof elements from losing their support. Where present, it is also advisable to make the connections between precast infill panels and the columns or panel-bearing beams.  <\/p><p>For cases where the analysis identifies localised critical issues at the level of individual columns \u2014 as occurs for some elements of Building C \u2014 the report indicates, as an alternative or supplement, reinforcement by means of a steel cage with battens and composite systems, to restore local ductility where necessary.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-e387815 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"e387815\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2aead2f\" data-id=\"2aead2f\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-f538eda elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"f538eda\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-dc148d6 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"dc148d6\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-97cc3a2\" data-id=\"97cc3a2\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-3b6cebc elementor-widget elementor-widget-heading\" data-id=\"3b6cebc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">The results: from Class C to Class A, with two classes of improvement<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-4f52ecb elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"4f52ecb\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-5a657b0\" data-id=\"5a657b0\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-5d52a56 elementor-widget elementor-widget-image\" data-id=\"5d52a56\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"597\" height=\"800\" src=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/08-vista-esterna-capannone-brugherio-dopo-miglioramento-sismico-giorno.jpg\" class=\"attachment-large size-large wp-image-5009\" alt=\"\" srcset=\"https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/08-vista-esterna-capannone-brugherio-dopo-miglioramento-sismico-giorno.jpg 597w, https:\/\/teknoprogettisrl.it\/wp-content\/uploads\/2026\/05\/08-vista-esterna-capannone-brugherio-dopo-miglioramento-sismico-giorno-224x300.jpg 224w\" sizes=\"(max-width: 597px) 100vw, 597px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-69fbcca elementor-widget elementor-widget-text-editor\" data-id=\"69fbcca\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em>Interior view of a detail of the connection between the perimeter panel and the column: the same building, after the mechanical connections, goes from Class C to Class A of IS-V seismic risk.<\/em><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-9ff4d08 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"9ff4d08\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-e135938\" data-id=\"e135938\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-dc64ff3 elementor-widget elementor-widget-text-editor\" data-id=\"dc64ff3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The results of the model with the mechanical connections in place are clear-cut. The risk indicator rises to <strong>iPGA (\u03b6E) = 0.9635<\/strong>, with the governing mechanism shifting from the roof tiles losing their support to the bending of the columns \u2014 that is, from a brittle, sudden collapse to a more ductile and controllable structural mechanism. <\/p><p>In terms of seismic classification, Building B goes from <strong>Class C to Class A of IS-V<\/strong>, with an analytical improvement of <strong>two classes<\/strong> pursuant to Ministerial Decree 28\/02\/2017 \u2014 Sismabonus Guidelines.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-2d80d7e elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"2d80d7e\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-d84e8a9\" data-id=\"d84e8a9\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-5bcd350 elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"5bcd350\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-0188016 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"0188016\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2773371\" data-id=\"2773371\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-e7798da elementor-widget elementor-widget-heading\" data-id=\"e7798da\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Why this case is worth telling<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-1f39c80 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"1f39c80\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-9f1a307\" data-id=\"9f1a307\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-a4a2126 elementor-widget elementor-widget-text-editor\" data-id=\"a4a2126\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Across Italy there are tens of thousands of industrial buildings constructed in the 1970s, 1980s and 1990s with this structural logic: precast columns fixed at the base, beams and tiles simply resting in place, no mechanical connections. The 2012 Emilia earthquake showed dramatically how this category of building collapses through the loss of support of the roof elements, well before the columns reach their ultimate strength. <\/p><p>Carrying out a vulnerability assessment on these buildings, as on a <a href=\"https:\/\/teknoprogettisrl.it\/en\/seismic-improvement-of-a-nursery-school-from-vulnerability-assessment-to-pnrr-funded-project\/\" target=\"_blank\" rel=\"noopener\">nursery school<\/a> or a <a href=\"https:\/\/teknoprogettisrl.it\/en\/seismic-vulnerability-assessment-of-a-fire-station-in-brianza-investigation-campaign-fem-model-and-risk-indicators\/\" target=\"_blank\" rel=\"noopener\">fire station<\/a>, means first of all understanding what the expected collapse mechanism is, not just measuring the strength of the materials. And intervening often means little in the way of heavy structural work \u2014 no demolitions, no enlarging of columns \u2014 but point connections at the joints that completely change the seismic behaviour of the building. <\/p><p>This is the kind of result that makes a vulnerability assessment an investment, not just an obligation.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-c57fe10 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"c57fe10\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1616411\" data-id=\"1616411\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-1389d50 elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"1389d50\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-f28eb08 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"f28eb08\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-5d32655\" data-id=\"5d32655\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-e76c4c0 elementor-widget elementor-widget-heading\" data-id=\"e76c4c0\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">FAQ<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-7f31b5b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7f31b5b\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-940dedf\" data-id=\"940dedf\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-60e102c elementor-widget elementor-widget-text-editor\" data-id=\"60e102c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul><li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"132:1-132:266;10666-10931\"><strong>Why are pre-2008 precast buildings seismically vulnerable?<\/strong> <br>In Lombardy, the obligation for seismic design came into force in 2008; many earlier structures have beams and tiles simply resting in place, without mechanical connections.<\/li><li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"133:1-133:223;10932-11154\"><strong>What is the typical collapse mechanism of these structures?<\/strong> <br>The loss of support of the roof tiles due to excessive horizontal displacement of the columns, before the materials reach their ultimate strength.<\/li><li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"134:1-134:265;11155-11419\"><strong>What are mechanical connections and why are they enough?<\/strong> <br>Certified systems that kinematically restrain the precast elements at the beam-column and beam-tile joints, preventing them from sliding out of place without heavy work on the load-bearing structures.<\/li><li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"135:1-135:217;11420-11636\"><strong>How much can the seismic risk class be improved?<\/strong> <br>In this case, Building B went from Class C to Class A of IS-V, two classes of improvement pursuant to the Sismabonus Guidelines (Ministerial Decree 28\/02\/2017).<\/li><li class=\"font-claude-response-body whitespace-normal break-words pl-2\" data-sourcepos=\"136:1-136:212;11637-11848\"><strong>Is it necessary to demolish or enlarge the columns?<\/strong> <br>Often not: the intervention focuses on point connections at the joints, with steel caging only where the analysis identifies localised critical issues.<\/li><\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-0a14ac6 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"0a14ac6\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-0fda32d\" data-id=\"0fda32d\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-195015c elementor-widget elementor-widget-spacer\" data-id=\"195015c\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>In precast industrial buildings constructed before 2008, seismic vulnerability lies not in the strength of the materials, but in the absence of mechanical connections between beams, columns and roof tiles \u2014 the collapse mechanism that emerged dramatically in the 2012 Emilia earthquake. Teknoprogetti Engineering assessed the seismic vulnerability of a production complex in Brugherio (MB) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4995,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[48],"class_list":["post-5167","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-our-works","tag-senza-copertina"],"_links":{"self":[{"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/posts\/5167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/comments?post=5167"}],"version-history":[{"count":1,"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/posts\/5167\/revisions"}],"predecessor-version":[{"id":5168,"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/posts\/5167\/revisions\/5168"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/media\/4995"}],"wp:attachment":[{"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/media?parent=5167"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/categories?post=5167"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/teknoprogettisrl.it\/en\/wp-json\/wp\/v2\/tags?post=5167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}