Download the operational checklist for NDT investigations on X-Lam timber structures
Leave your name and email: we will send you the PDF with 19 operational checkpoints to avoid any mistake — from the preliminary phase to the delivery of the technical report.
A — Preliminary phaseA — Fase preliminare
Before the investigation campaign, verify:Prima della campagna di indagini, verifica:
- Define the purpose (statutory testing / site supervision / survey / due diligence)
- Verify accessibility to elements and instrument availability
- Download the operational checklist for NDT investigations on X-Lam timber structures
- and much more…
B — During testing
During instrumental testing:
- Calibrate the sclerometer with a reference sample
- Measure moisture before pin penetration testing
- Carry out at least 2 measurements per element
- Photograph each measurement point with a unique code
- and much more…
C — Processing and reporting
After the tests, for reporting:
- Calculate the mean value and heterogeneity coefficient Cs for each element
- Compare resistograms between elements of the same type
- Correlate sclerometric anomalies with moisture data and resistograms
- and much more…